The annual waste disposal capacity of the project is not less than 500,000m³. The sewage of the dairy hall and the domestic sewage of the pasture are deeply treated and discharged after reaching the standard. At the same time, the deep processing of solid digestate after anaerobic fermentation is used as cattle bedding, which reduces the cost of purchasing bedding material in the pasture, returns biogas to the field as resources, and connects the biogas after anaerobic fermentation to the grid, making a positive contribution to environmental protection. The core anaerobic reactor adopts an integrated enamel assembly structure and is equipped with a mixing device imported from Germany to ensure the efficient and stable operation of the project.
Construction time: 2022
Type of raw materials: Cow manure
Daily biogas production: 20000m³
Biogas utilization: Biogas power generation