The project uses vegetable leaves and residues as raw materials, and daily treats 2,500 tons producing 40,00m ³ of biogas per day. After sewage treatment, the biogas liquid is discharged into the sewage network. The project not only treated the waste but also obtained green and clean energy.
Construction time: 2018
Type of raw materials: Abandoned vegetable waste leaves
Daily biogas production: 40000m³
Biogas utilization: Upgraded natural gas