This project is a supporting manure treatment project for 25,000 dairy cows. With manure, spray water and milk hall wastewater as the main raw materials, it is expected to produce 50,00m ³ of biogas per day, dry biogas residue to be used as bedding material for cattle farm, milk hall water to reach the agricultural irrigation water discharge standard after sewage treatment, and biogas slurry to be returned to the field.
Construction time: 2020
Type of raw materials: Cow manure+ spray water+ dairy waste water
Daily biogas production: 50000m³
Biogas utilization: Biogas power generation+pasture heating